This commercial and residential development includes a multi-storey underground carpark and two multi-storey tower blocks.
A pre-existing contiguous wall was used for the carpark of an adjacent building.
A Class Piling and Drilling built a second contiguous wall below the level of the first one, to a depth of 8m, to retain sands and waters and enable excavation for the new carpark.