CFA Piling
300mm, 400mm, 450mm and 600mm, 750mm drilling depth of 9m, 14-tonne highly-manoeuvrable drilling rig suitable for difficult sites. Along with 26 tonne CFA drill rig capability of drilling 15 metres deep.
Continuous flight auger piling has the advantage of minimum vibration and noise during installation and is suitable for closely settled areas. The constantly rotating auger retains the walls of a drill hole without requiring the insertion of a casing when used in conjunction with grout-injected piles. A concrete grout mixture is injected into the hole as the auger is withdrawn under pressure, thus forming a pile.
Concrete grout injected piles with a continuous flight auger rig can be installed through unstable and saturated soils and low to medium strength rock. This speeds up the process, requires less manpower and is a cost-effective solution to the construction of concrete grout injection piles.